D 280
Return at the base camp, the crew builds the wall for the cupola.
The wall was made (soon finished) by the cimentery Unity (shown nextly).
1920 x 1080 in Q4
The hangar with its airlocks are finished.
Climatisation has been installed.
It can serve of refuge during the construction.
[:)]