Re: 2040 : Mars Two

by bdfd » Thu Dec 22, 2016 5:49 am

D 280

Return at the base camp, the crew builds the wall for the cupola.
The wall was made (soon finished) by the cimentery Unity (shown nextly).

Image
1920 x 1080 in Q4

The hangar with its airlocks are finished.
Climatisation has been installed.
It can serve of refuge during the construction.

[:)]