In the morning all crew is exciting, the drill begins its job. [:)]
=> At depth of 20 m, the drill was fallen on volcanic stones with iron... and broke. [:(]
At noon, crew will install the second drill (output orange chests). [B-)]
1920 x 1080 in Q4
At 5 PM, Pierre moved the second drill.
Winnie searches the deeper sediments.
Far on the horizon we can go to the end of Ares Vallis...