The yard has been enlarged.
To the left of the house, new foundations were poured with concrete.
The porotherm bricks have arrived.
The mason began to climb the walls.
In detail, we can see the steel sills.
[:)]
Evil progresses when good people do nothing!
---
SH3D 7.1 and nothing else - W11 64b in 4K
The masons reached the first height for the garage.
They started the internal walls.
At the back, we see tubes coming out of the foundations :
1. From the cold water in blue,
2. Hot water in red,
3. Wastewater evacuations in gray,
4. Electricity in green.
We can see clamps and planks to cast the lintel at rear door.
The kitchen-cellar access door was made.
the waste evacuation tube has been removed.
[:)]
Evil progresses when good people do nothing!
---
SH3D 7.1 and nothing else - W11 64b in 4K
On the other side of the building, the macons made the foundations of the master suite (right) and the extension of the living room (left).
New pallets of bricks have been delivered.
[:)]
Evil progresses when good people do nothing!
---
SH3D 7.1 and nothing else - W11 64b in 4K
The new walls are erected for the Master suite and the living room.
The suite is equipped with windows for the WIC and the bathroom.
At this time only the ground floor is impacted.
A new hole near the garages is here for the new kitchen area.
It was made in the kitchen supported by 3 props.
[:)]
.