View of EVA output from bathroom for the control.
Light is red, pressure is too high for Mars.
1920 x 1080 in Q4
with R1.3.1 (AA:2/4, gI:def, dB/cP: 2/0, sS:def, nlfD/nlr: 250/1, f/sA:mitchel/bucket) in 00h17mn.
1920 x 1080 in Q4
with R1.3.1 (AA:2/4, gI:def, dB/cP: 2/0, sS:def, nlfD/nlr: 250/1, f/sA:mitchel/bucket) in 00h17mn.
Green, half round and Pierre can go out !
First make the usual samples.
D 244
Then install the first drill.
1920 x 1080 in Q4
Technical
Drill is in two parts:
On the ground: the feet
above the pipe refills to drill.
The maximum depth is 45 m.
Tomorrow , the drill comes in action !
Good night Exploration crew...
1920 x 1080 in Q4
[:)]